SPRUJB6B November 2024 – May 2025 AM2612 , AM2612-Q1
Implement the following steps to use SWSYNC with ECAP1 and ECAP2.
To use SWSYNC with other eCAP modules, make sure that the previous eCAP chain is not generating a SYNCOUT signal that interferes with the software synchronization.