SPRUJC6B October 2025 – April 2026 AM2752-Q1 , AM2754-Q1
After reset, all threads/channels in the PDMA will be idle and waiting for work to be assigned to them. In order to initiate PDMA operation, the Host will need to first pair the channel with a remote data source (normally a UDMA-P channel), set up the static TR for the channel, and enable the thread.