2 修订历史记录
Changes from May 4, 2018 to July 15, 2018 (from D Revision (May 2018) to E Revision)
- 删除了部分安全引导支持信息Go
- Updated porz, resetn and rstoutn signal descriptions in Table 4-23, PRCM Signal DescriptionsGo
- Updated vpp supply voltage range for normal operation in Table 5-13, Recommended Operating Conditions for OTP eFuse ProgrammingGo
- Updated Figure 5-5, Power-Up SequencingGo
- Updated system clock names in Section 5.10.4, Clock SpecificationsGo
- Updated phase polarity in all QSPI timing figuresGo
- Updated note for cosmetic marks on packageGo