ZHCSII3E August 2016 – July 2018
PRODUCTION DATA.
CAUTION
The I/O Timings provided in this section are valid only for some GMAC usage modes when the corresponding Virtual I/O Timings or Manual I/O Timings are configured as described in the tables found in this section.
Table 5-103, Table 5-104 and Figure 5-68 present timing requirements for receive RGMIIn operation.