ZHCSJC6F March 2016 – June 2018 TDA2E
PRODUCTION DATA.
CAUTION
The I/O Timings provided in this section are valid only for some GMAC usage modes when the corresponding Virtual I/O Timings or Manual I/O Timings are configured as described in the tables found in this section.
Table 7-81, Table 7-82 and Figure 7-52 present timing requirements for receive RGMIIn operation.