ZHCSMW2C December 2021 – November 2025 LM5123-Q1
PRODUCTION DATA
请参考 PDF 数据表获取器件具体的封装图。
Date Letter Revision History Changes Intro HTMLB (January 2022)to RevisionC (November 2025)
Date Letter Revision History Changes Intro HTMLA (December 2021)to RevisionB (January 2022)
Date Letter Revision History Changes Intro HTML* (December 2020)to RevisionA (December 2021)