ZHCSDZ0B July   2015  – January 2022 TUSB4020BI-Q1

PRODUCTION DATA  

  1. 特性
  2. 应用
  3. 说明
  4. Revision History
  5. 说明(续)
  6. Pin Configuration and Functions
  7. Specifications
    1. 7.1 Absolute Maximum Ratings (1)
    2. 7.2 ESD Ratings
    3. 7.3 Recommended Operating Conditions
    4. 7.4 Thermal Information
    5. 7.5 3.3-V I/O Electrical Characteristics
    6. 7.6 Hub Input Supply Current
    7. 7.7 Power-Up Timing Requirements
  8. Detailed Description
    1. 8.1 Overview
    2. 8.2 Functional Block Diagram
    3. 8.3 Feature Description
      1. 8.3.1 Battery Charging Features
      2. 8.3.2 USB Power Management
      3. 8.3.3 Clock Generation
      4. 8.3.4 Power-Up and Reset
    4. 8.4 Device Functional Modes
      1. 8.4.1 External Configuration Interface
    5. 8.5 Programming
      1. 8.5.1 One-Time Programmable (OTP) Configuration
      2. 8.5.2 I2C EEPROM Operation
      3. 8.5.3 SMBus Slave Operation
    6. 8.6 Register Maps
      1. 8.6.1 Configuration Registers
        1. 8.6.1.1  ROM Signature Register (offset = 0h) [reset = 0h]
        2. 8.6.1.2  Vendor ID LSB Register (offset = 1h) [reset = 51h]
        3. 8.6.1.3  Vendor ID MSB Register (offset = 2h) [reset = 4h]
        4. 8.6.1.4  Product ID LSB Register (offset = 3h) [reset = 25h]
        5. 8.6.1.5  Product ID MSB Register (offset = 4h) [reset = 80h]
        6. 8.6.1.6  Device Configuration Register (offset = 5h) [reset = 1Xh]
        7. 8.6.1.7  Battery Charging Support Register (offset = 6h) [reset = 0Xh]
        8. 8.6.1.8  Device Removable Configuration Register (offset = 7h) [reset = 0Xh]
        9. 8.6.1.9  Port Used Configuration Register (offset = 8h) [reset = 0h]
        10. 8.6.1.10 PHY Custom Configuration Register (offset = 9h) [reset = 0h]
        11. 8.6.1.11 Device Configuration Register 2 (offset = Ah)
        12. 8.6.1.12 UUID Registers (offset = 10h to 1Fh)
        13. 8.6.1.13 Language ID LSB Register (offset = 20h)
        14. 8.6.1.14 Language ID MSB Register (offset = 21h)
        15. 8.6.1.15 Serial Number String Length Register (offset = 22h)
        16. 8.6.1.16 Manufacturer String Length Register (offset = 23h)
        17. 8.6.1.17 Product String Length Register (offset = 24h)
        18. 8.6.1.18 Serial Number Registers (offset = 30h to 4Fh)
        19. 8.6.1.19 Manufacturer String Registers (offset = 50h to 8Fh)
        20. 8.6.1.20 Product String Registers (offset = 90h to CFh)
        21. 8.6.1.21 Additional Feature Configuration Register (offset = F0h)
        22. 8.6.1.22 Charging Port Control Register (offset = F2h)
        23. 8.6.1.23 Device Status and Command Register (offset = F8h)
  9. Application and Implementation
    1. 9.1 Application Information
      1. 9.1.1 Crystal Requirements
      2. 9.1.2 Input Clock Requirements
    2. 9.2 Typical Applications
      1. 9.2.1 Upstream Port Implementation
        1. 9.2.1.1 Design Requirements
        2. 9.2.1.2 Detailed Design Procedure
        3. 9.2.1.3 Application Curves
      2. 9.2.2 Downstream Port 1 Implementation
      3. 9.2.3 Downstream Port 2 Implementation
      4. 9.2.4 VBUS Power Switch Implementation
      5. 9.2.5 Clock, Reset, and Miscellaneous
      6. 9.2.6 Power Implementation
  10. 10Power Supply Recommendations
    1. 10.1 Power Supply
    2. 10.2 Downstream Port Power
    3. 10.3 Ground
  11. 11Layout
    1. 11.1 Layout Guidelines
      1. 11.1.1 Placement
      2. 11.1.2 Package Specific
      3. 11.1.3 Differential Pairs
    2. 11.2 Layout Example
  12. 12Device and Documentation Support
    1. 12.1 接收文档更新通知
    2. 12.2 支持资源
    3. 12.3 Trademarks
    4. 12.4 Electrostatic Discharge Caution
    5. 12.5 术语表
  13. 13Mechanical, Packaging, and Orderable Information

封装选项

机械数据 (封装 | 引脚)
散热焊盘机械数据 (封装 | 引脚)
订购信息

Power-Up and Reset

The TUSB4020BI-Q1 does not have specific power sequencing requirements with respect to the VDD or VDD33 power rails. The VDD or VDD33 power rails may be powered up for an indefinite period of time while the other is not powered up if all of these constraints are met:

  • All maximum ratings and recommended operating conditions are observed.
  • All warnings about exposure to maximum rated and recommended conditions are observed, particularly junction temperature. These apply to power transitions as well as normal operation.
  • Bus contention while VDD33 is powered-up must be limited to 100 hours over the projected lifetime of the device.
  • Bus contention while VDD33 is powered-down may violate the absolute maximum ratings.

A supply bus is powered up when the voltage is within the recommended operating range. A supply bus is powered down when it is below that range, either stable or in transition.

A minimum reset duration of 3 ms is required, which is defined as the time when the power supplies are in the recommended operating range to the deassertion of GRSTz. This can be generated using programmable-delay supervisory device or using an RC circuit.