ZHCSU23A October 2023 – December 2023 BQ25638
PRODUCTION DATA
请参考 PDF 数据表获取器件具体的封装图。
After the REGN LDO powers up, the device checks the current capability of the input source. The input source has to meet the following requirements in order to move forward to the next power on steps.