TIDT196 September   2020  – MONTH 

 

  1. 1Description
  2. 2Test Prerequisites
    1. 2.1 Design Requirements
    2. 2.2 Required Equipment
    3. 2.3 Considerations
    4. 2.4 Dimensions
    5. 2.5 Test Setup
  3. 3Testing and Results
    1. 3.1 Efficiency Graphs
    2. 3.2 Efficiency Data
    3. 3.3 Thermal Images
    4. 3.4 Frequency Response
    5. 3.5 Load Sharing
  4. 4Waveforms
    1. 4.1 Switching
    2. 4.2 Output Voltage Ripple
    3. 4.3 Load Transients
    4. 4.4 Start-up
    5. 4.5 Reverse Switching

Start-up

The start-up behavior is shown in the following figures.

GUID-20200828-CA0I-0J1N-X1Z9-JS6L5XQ80SW0-low.pngFigure 4-17 Startup, 2-Phase, 8-V Input, 615-W Load
GUID-20200828-CA0I-CLSS-SNNW-ZQMRPV5CRVQH-low.pngFigure 4-19 Startup, 2-Phase, 12-V Input, 1230-W Load
GUID-20200828-CA0I-D4BC-WD2B-BFQFDHS1Q1TZ-low.pngFigure 4-21 Startup, 2-Phase, 18-V Input, 1230-W Load
GUID-20200828-CA0I-66JB-N9LK-HGNCKS4LDPXF-low.pngFigure 4-18 Startup, 4-Phase, 8-V Input, 615-W Load
GUID-20200828-CA0I-PZML-PJ2P-BRQQ9P0MV119-low.pngFigure 4-20 Startup, 4-Phase, 12-V Input, 1230-W Load
GUID-20200828-CA0I-78FQ-TPZW-D0M3PN8TH31K-low.pngFigure 4-22 Startup, 4-Phase, 18-V Input, 1230-W Load