TIDT195 September   2020  – MONTH 

 

  1.   Description
  2. 1Test Prerequisites
    1. 1.1 Voltage and Current Requirements
    2. 1.2 Required Equipment
  3. 2Testing and Results
    1. 2.1 Thermal Images
    2. 2.2 Efficiency and Power Dissipation Graphs
    3. 2.3 Efficiency and Power Dissipation Data
    4. 2.4 Voltage Regulation
  4. 3Waveforms
    1. 3.1 Start-up
    2. 3.2 Switch Node
    3. 3.3 Output Voltage Ripple
    4. 3.4 Load Transients
    5. 3.5 Short-Circuit Recovery Response

Required Equipment

  • Resistive load (resistor decade box), 5 W minimum

  • Power supply, adjustable, 0 V–200 V and 0.25 A minimum

  • Oscilloscope and probes

  • Digital multimeter