Use the following list to set up the EVM testing equipment:
- Review EVM jumper connections in Table 2-2.
- Set PS #1 for 5V DC, 2A current limit and then
turn off the supply.
- Connect the output of PS#1 in series with a current meter to J1 (VIN and PGND).
- Connect a voltage meter across TP10 (VBUS) and TP31 (PGND), or across J1.
- Turn on Load #1, set to constant voltage mode, and output to 2.5V. Disable Load.
Connect Load in series with a current meter (multimeter), ground side, to J4
(BAT and PGND) as shown in Figure 2-1 if not using a source meter with current measuring
capabilities.
- Connect a voltage meter across TP13 (BAT) and TP32
(PGND), or across J4-3 and J4-1 as in Figure 2-1.
- Connect a voltage meter across TP14 (SYS) and TP32
(PGND), or across J2-1 and J2-2 as in Figure 2-1.
- Connect a voltage meter across TP12 (PMID) and TP32 (PGND).
- Connect the EV2400 USB interface board to the
computer with a USB cable and from I2C port to J10 with the 4-pin cable as in
Figure 2-1.
- Install shunts as shown in Table 2-2. Note that the shunts in Figure 2-1 are not necessarily installed per the table.