Use the following steps for charger mode verification:
- PS #1 is on from Section 3.2.1. In the EVM software,
select
twice.
- Verify that all Fault
statuses read Normal.
- To confirm SYS voltage regulation, enable Load #1
(see Section 2.4) and
take DMM measurements as follows:
- Measure →
VSYS (SYS-TP14 and PGND-TP27 or TP29) = 3.75V ±0.3V.
- Measure →
VBAT (BAT-TP13 and PGND-TP27 or TP29) = 2.5V ±0.2V.
- Measure →
IBAT = 200mA ±50mA.
- To confirm battery charge current regulation, change Load #1 to 3.7V and take DMM measurements as follows:
- Measure → VSYS (SYS-TP14 and PGND-TP27 or TP29) = 3.8V ±0.3V.
- Measure → VBAT (BAT-TP13 and PGND-TP27 or TP29) = 3.7V ±0.2V.
- Measure → IBAT = 480mA
±100mA.
- To confirm input current limit operation, in the EVM software on the 16-bit tab,
set fast charge current to 1040mA and then take DMM measurement ( or PS #1
measurement if accurate) as follows:
- Measure →
IIN = 500 mA ±200mA.