SLLU146D May   2011  – June 2025

 

  1.   1
  2.   Description
  3.   Features
  4.   Applications
  5.   5
  6. 1Evaluation Module Overview
    1. 1.1 Introduction
  7. 2Hardware
    1. 2.1 EVM Board
      1. 2.1.1 TUSB7340 DEMO Boards
    2. 2.2 Hardware Setup
      1. 2.2.1 Power
      2. 2.2.2 VBUS
      3. 2.2.3 PCI Express Slot Options
    3. 2.3 Bringup
    4. 2.4 WAKE Testing Setup
  8. 3Hardware Design Files
    1. 3.1 Schematics
      1. 3.1.1 TUSB7340 DEMO EVM REVC Schematics
    2. 3.2 PCB Layouts
      1. 3.2.1 TUSB7340 PCB Layouts
    3. 3.3 Bill of Materials (BOM)
      1. 3.3.1 TUSB7340 DEMO REVC BOM
  9. 4Additional Information
    1. 4.1 Trademarks
  10. 5Revision History

TUSB7340 DEMO EVM REVC Schematics

TUSB7340EVM TUSB7340EVM Schematic (Page 1)Figure 3-1 TUSB7340EVM Schematic (Page 1)
TUSB7340EVM TUSB7340EVM Schematic (Page 2)Figure 3-2 TUSB7340EVM Schematic (Page 2)
TUSB7340EVM TUSB7340EVM Schematic (Page 3)Figure 3-3 TUSB7340EVM Schematic (Page 3)
TUSB7340EVM TUSB7340EVM Schematic (Page 4)Figure 3-4 TUSB7340EVM Schematic (Page 4)