SLLU146D May   2011  – June 2025 TUSB7340

 

  1.   1
  2.   Description
  3.   Features
  4.   Applications
  5.   5
  6. 1Evaluation Module Overview
    1. 1.1 Introduction
  7. 2Hardware
    1. 2.1 EVM Board
      1. 2.1.1 TUSB7340 DEMO Boards
    2. 2.2 Hardware Setup
      1. 2.2.1 Power
      2. 2.2.2 VBUS
      3. 2.2.3 PCI Express Slot Options
    3. 2.3 Bringup
    4. 2.4 WAKE Testing Setup
  8. 3Hardware Design Files
    1. 3.1 Schematics
      1. 3.1.1 TUSB7340 DEMO EVM REVC Schematics
    2. 3.2 PCB Layouts
      1. 3.2.1 TUSB7340 PCB Layouts
    3. 3.3 Bill of Materials (BOM)
      1. 3.3.1 TUSB7340 DEMO REVC BOM
  9. 4Additional Information
    1. 4.1 Trademarks
  10. 5Revision History

TUSB7340 PCB Layouts

TUSB7340EVM PWRFigure 3-5 PWR
TUSB7340EVM Comp SideFigure 3-7 Comp Side
TUSB7340EVM Silkscreen TopFigure 3-9 Silkscreen Top
TUSB7340EVM Soldermask TopFigure 3-11 Soldermask Top
TUSB7340EVM Pastemask TopFigure 3-13 Pastemask Top
TUSB7340EVM GNDFigure 3-6 GND
TUSB7340EVM Silkscreen BottomFigure 3-8 Silkscreen Bottom
TUSB7340EVM Soldermask BottomFigure 3-10 Soldermask Bottom
TUSB7340EVM Pastemask BottomFigure 3-12 Pastemask Bottom