ZHCSAK3O
December 2012 – August 2024
TPD1E05U06
,
TPD4E05U06
,
TPD6E05U06
PRODUCTION DATA
1
1
特性
2
应用
3
说明
4
Pin Configuration and Functions
5
Specifications
Absolute Maximum Ratings
5.1
ESD Ratings—JEDEC Specification
5.2
ESD Ratings—IEC Specification
Recommended Operating Conditions
5.3
Thermal Information
5.4
Electrical Characteristics
5.5
Typical Characteristics
6
Detailed Description
6.1
Overview
6.2
Functional Block Diagram
6.3
Feature Description
6.3.1
±15-kV IEC61000-4-2 Level 4 ESD Protection
6.3.2
IEC61000-4-4 EFT Protection
6.3.3
IEC61000-4-5 Surge Protection
6.3.4
I/O Capacitance
6.3.5
DC Breakdown Voltage
6.3.6
Ultra-Low Leakage Current
6.3.7
Low ESD Clamping Voltage
6.3.8
Industrial Temperature Range
6.3.9
Easy Flow-Through Routing
6.4
Device Functional Modes
7
Application and Implementation
7.1
Application Information
7.2
Typical Applications
7.2.1
HDMI 2.0 Application
7.2.1.1
Design Requirements
7.2.1.2
Detailed Design Procedure
7.2.1.2.1
Signal Range on Pin 1, 2, 4, or 5
7.2.1.3
Application Curves
7.2.2
HDMI 2.0 Application
7.2.2.1
Design Requirements
7.2.2.2
Detailed Design Procedure
7.2.2.2.1
Signal Range
7.2.2.2.2
Operating Frequency
7.2.2.3
Application Curves
7.3
Power Supply Recommendations
7.4
Layout
7.4.1
Layout Guidelines
7.4.2
Layout Example
7.4.2.1
TPD4E05U06 Layout Example
7.4.2.2
TPD1E05U06 Layout Example
8
Device and Documentation Support
8.1
Documentation Support
8.1.1
Related Documentation
8.2
接收文档更新通知
8.3
支持资源
8.4
Trademarks
8.5
静电放电警告
8.6
术语表
9
Revision History
10
Mechanical, Packaging, and Orderable Information
10.1
Tape and Reel Information
10.2
Mechanical Data
封装选项
机械数据 (封装 | 引脚)
DPY|2
MPSS034E
DYA|2
MPSS124B
散热焊盘机械数据 (封装 | 引脚)
DPY|2
QFND841
订购信息
zhcsak3o_oa
zhcsak3o_pm
7.2.1.3
Application Curves
Figure 7-2
3.4-Gbps HDMI 1.4 TP1 Eye Diagram Unpopulated EVM
Figure 7-4
3.4-Gbps HDMI 1.4 TP1 Eye Diagram TPD4E05U06
Figure 7-6
6-Gbps HDMI 2.0 (TP1) Eye Diagram Unpopulated EVM
Figure 7-8
6-Gbps HDMI 2.0 (TP1) Eye Diagram TPD4E05U06
Figure 7-3
3.4-Gbps HDMI 1.4 TP1 Eye Diagram TPD1E05U06
Figure 7-5
3.4-Gbps HDMI 1.4 TP1 Eye Diagram TPD6E05U06
Figure 7-7
6-Gbps HDMI 2.0 (TP1) Eye Diagram TPD1E05U06
Figure 7-9
6-Gbps HDMI 2.0 (TP1) Eye Diagram TPD6E05U06