SLVUCG1 December   2022

 

  1.   Abstract
  2.   Trademarks
  3. 1Introduction
    1. 1.1 Before You Begin
  4. 2Schematic
  5. 3EVM Setup
    1. 3.1 Jumper Connections
      1. 3.1.1 J1
      2. 3.1.2 J2
      3. 3.1.3 J3
      4. 3.1.4 J4
      5. 3.1.5 J5
      6. 3.1.6 J6
      7. 3.1.7 J7
      8. 3.1.8 J8
      9. 3.1.9 J9
    2. 3.2 Test Points
    3. 3.3 Soldering Guidelines
  6. 4Equipment Connection and Operation
  7. 5PCB Layout
  8. 6Bill of Materials (BOM)

EVM Setup

This section describes how to properly connect and setup the UA78LEVM-075, including the jumpers and connectors on the EVM board. See Section 4 for the proper connections of test equipment.