SLUUD35 August   2025

 

  1.   1
  2.   Description
  3.   Get Started
  4.   Features
  5.   Applications
  6.   6
  7. 1Evaluation Module Overview
    1. 1.1 Introduction
    2. 1.2 Kit Contents
    3. 1.3 Specification
    4. 1.4 Device Information
  8. 2Hardware
    1. 2.1 Test Setup
      1. 2.1.1 System and Equipment Requirements
      2. 2.1.2 Connector Description
      3. 2.1.3 Input and Output Connection
  9. 3Hardware Design Files
    1. 3.1 Schematic
    2. 3.2 Layout
    3. 3.3 Bill of Materials
  10. 4Additional Information
    1. 4.1 Trademarks

Layout

Figure 3-2, Figure 3-3, Figure 3-4 and Figure 3-5 show the layout of the LP8868XQ1EVM printed circuit board (PCB).

LP8868XQ1EVM  LP8868XQ1EVM Top
          Layer Figure 3-2 LP8868XQ1EVM Top Layer
LP8868XQ1EVM  LP8868XQ1EVM
          Inner Layer 1 Figure 3-3 LP8868XQ1EVM Inner Layer 1
LP8868XQ1EVM  LP8868XQ1EVM
          Inner Layer 2 Figure 3-4 LP8868XQ1EVM Inner Layer 2
LP8868XQ1EVM  LP8868XQ1EVM
          Bottom Layer Figure 3-5 LP8868XQ1EVM Bottom Layer