ZHCSFO4C November   2016  – June 2018 LMT01-Q1

PRODUCTION DATA.  

  1. 1 特性
  2. 2 应用
    1.     LMT01-Q1 精度
  3. 3 说明
    1.     双引脚集成电路 (IC) 温度传感器
  4. 4 修订历史记录
  5. 5 Pin Configuration and Functions
    1.     Pin Functions
  6. 6 Specifications
    1. 6.1  Absolute Maximum Ratings
    2. 6.2  ESD Ratings
    3. 6.3  Recommended Operating Conditions
    4. 6.4  Thermal Information
    5. 6.5  Electrical Characteristics
    6. 6.6  Electrical Characteristics - TO-92/LPG Pulse Count to Temperature LUT
    7. 6.7  Electrical Characteristics - WSON/DQX Pulse Count to Temperature LUT
    8. 6.8  Switching Characteristics
    9. 6.9  Timing Diagram
    10. 6.10 Typical Characteristics
  7. 7 Detailed Description
    1. 7.1 Overview
    2. 7.2 Functional Block Diagram
    3. 7.3 Feature Description
      1. 7.3.1 Output Interface
      2. 7.3.2 Output Transfer Function
      3. 7.3.3 Current Output Conversion to Voltage
    4. 7.4 Device Functional Modes
  8. 8 Application and Implementation
    1. 8.1 Application Information
      1. 8.1.1 Mounting, Temperature Conductivity, and Self-Heating
    2. 8.2 Typical Application
      1. 8.2.1 3.3-V System VDD MSP430 Interface - Using Comparator Input
        1. 8.2.1.1 Design Requirements
        2. 8.2.1.2 Detailed Design Procedure
          1. 8.2.1.2.1 Setting the MSP430 Threshold and Hysteresis
        3. 8.2.1.3 Application Curves
    3. 8.3 System Examples
  9. 9 Power Supply Recommendations
  10. 10Layout
    1. 10.1 Layout Guidelines
    2. 10.2 Layout Example
  11. 11器件和文档支持
    1. 11.1 接收文档更新通知
    2. 11.2 社区资源
    3. 11.3 商标
    4. 11.4 静电放电警告
    5. 11.5 术语表
  12. 12机械、封装和可订购信息

封装选项

机械数据 (封装 | 引脚)
散热焊盘机械数据 (封装 | 引脚)
订购信息

Application Curves

LMT01-Q1 LMT01_6.81k_EVM_RemovedQ_NOpF1M10pFprobe_3P3VNC9.png
Amplitude = 200 mV/div Δy at cursors = 500 mV
Time Base = 10 µs/div Δx at cursors = 11.7 µs
Figure 24. MSP430 COMP_B Input Signal No Capacitance Load
LMT01-Q1 LMT01_6.81k_EVM_RemovedQ_110pF1M10pFprobe_3P3Va6.png
Amplitude = 200 mV/div Δy at cursors = 484 mV
Time Base = 10 µs/div Δx at cursors = 11.7 µs
Figure 25. MSP430 COMP_B Input Signal 100-pF Capacitance Load