ZHCSGR4 September   2017 ADC32RF82

PRODUCTION DATA.  

  1. 1 特性
  2. 2 应用
  3. 3 说明
  4. 4 修订历史记录
  5. 5 Pin Configuration and Functions
  6. 6 Specifications
    1. 6.1  Absolute Maximum Ratings
    2. 6.2  ESD Ratings
    3. 6.3  Recommended Operating Conditions
    4. 6.4  Thermal Information
    5. 6.5  Electrical Characteristics
    6. 6.6  AC Performance Characteristics: fS = 2457.6 MSPS
    7. 6.7  AC Performance Characteristics: fS = 2211.84 MSPS
    8. 6.8  AC Performance Characteristics: fS = 1966.08 MSPS
    9. 6.9  Digital Requirements
    10. 6.10 Timing Requirements
    11. 6.11 Typical Characteristics
  7. 7 Parameter Measurement Information
    1. 7.1 Input Clock Diagram
  8. 8 Detailed Description
    1. 8.1 Overview
    2. 8.2 Functional Block Diagram
    3. 8.3 Feature Description
      1. 8.3.1  Analog Inputs
        1. 8.3.1.1 Input Clamp Circuit
      2. 8.3.2  Clock Input
      3. 8.3.3  SYSREF Input
        1. 8.3.3.1 Using SYSREF
        2. 8.3.3.2 Frequency of the SYSREF Signal
      4. 8.3.4  DDC Block
        1. 8.3.4.1 Operating Mode: Receiver
        2. 8.3.4.2 Operating Mode: Wide-Bandwidth Observation Receiver
        3. 8.3.4.3 Decimation Filters
          1. 8.3.4.3.1  Divide-by-4
          2. 8.3.4.3.2  Divide-by-6
          3. 8.3.4.3.3  Divide-by-8
          4. 8.3.4.3.4  Divide-by-9
          5. 8.3.4.3.5  Divide-by-10
          6. 8.3.4.3.6  Divide-by-12
          7. 8.3.4.3.7  Divide-by-16
          8. 8.3.4.3.8  Divide-by-18
          9. 8.3.4.3.9  Divide-by-20
          10. 8.3.4.3.10 Divide-by-24
          11. 8.3.4.3.11 Divide-by-32
          12. 8.3.4.3.12 Latency with Decimation Options
        4. 8.3.4.4 Digital Multiplexer (MUX)
        5. 8.3.4.5 Numerically-Controlled Oscillators (NCOs) and Mixers
      5. 8.3.5  NCO Switching
      6. 8.3.6  SerDes Transmitter Interface
      7. 8.3.7  Eye Diagrams
      8. 8.3.8  Alarm Outputs: Power Detectors for AGC Support
        1. 8.3.8.1 Absolute Peak Power Detector
        2. 8.3.8.2 Crossing Detector
        3. 8.3.8.3 RMS Power Detector
        4. 8.3.8.4 GPIO AGC MUX
      9. 8.3.9  Power-Down Mode
      10. 8.3.10 ADC Test Pattern
        1. 8.3.10.1 Digital Block
        2. 8.3.10.2 Transport Layer
        3. 8.3.10.3 Link Layer
    4. 8.4 Device Functional Modes
      1. 8.4.1 Device Configuration
      2. 8.4.2 JESD204B Interface
        1. 8.4.2.1 JESD204B Initial Lane Alignment (ILA)
        2. 8.4.2.2 JESD204B Frame Assembly
        3. 8.4.2.3 JESD204B Frame Assembly with Decimation (Single-Band DDC): Complex Output
        4. 8.4.2.4 JESD204B Frame Assembly with Decimation (Single-Band DDC): Real Output
        5. 8.4.2.5 JESD204B Frame Assembly with Decimation (Single-Band DDC): Real Output
        6. 8.4.2.6 JESD204B Frame Assembly with Decimation (Dual-Band DDC): Complex Output
        7. 8.4.2.7 JESD204B Frame Assembly with Decimation (Dual-Band DDC): Real Output
      3. 8.4.3 Serial Interface
        1. 8.4.3.1 Serial Register Write: Analog Bank
        2. 8.4.3.2 Serial Register Readout: Analog Bank
        3. 8.4.3.3 Serial Register Write: Digital Bank
        4. 8.4.3.4 Serial Register Readout: Digital Bank
        5. 8.4.3.5 Serial Register Write: Decimation Filter and Power Detector Pages
    5. 8.5 Register Maps
      1. 8.5.1  Example Register Writes
      2. 8.5.2  Register Descriptions
        1. 8.5.2.1 General Registers
          1. 8.5.2.1.1 Register 000h (address = 000h), General Registers
          2. 8.5.2.1.2 Register 002h (address = 002h), General Registers
          3. 8.5.2.1.3 Register 003h (address = 003h), General Registers
          4. 8.5.2.1.4 Register 004h (address = 004h), General Registers
          5. 8.5.2.1.5 Register 010h (address = 010h), General Registers
          6. 8.5.2.1.6 Register 011h (address = 011h), General Registers
          7. 8.5.2.1.7 Register 012h (address = 012h), General Registers
      3. 8.5.3  Master Page (M = 0)
        1. 8.5.3.1 Register 020h (address = 020h), Master Page
        2. 8.5.3.2 Register 032h (address = 032h), Master Page
        3. 8.5.3.3 Register 039h (address = 039h), Master Page
        4. 8.5.3.4 Register 03Ch (address = 03Ch), Master Page
        5. 8.5.3.5 Register 05Ah (address = 05Ah), Master Page
        6. 8.5.3.6 Register 03Dh (address = 3Dh), Master Page
        7. 8.5.3.7 Register 057h (address = 057h), Master Page
        8. 8.5.3.8 Register 058h (address = 058h), Master Page
      4. 8.5.4  ADC Page (FFh, M = 0)
        1. 8.5.4.1 Register 03Fh (address = 03Fh), ADC Page
        2. 8.5.4.2 Register 042h (address = 042h), ADC Page
      5. 8.5.5  Digital Function Page (610000h, M = 1 for Channel A and 610100h, M = 1 for Channel B)
        1. 8.5.5.1 Register A6h (address = 0A6h), Digital Function Page
      6. 8.5.6  Offset Corr Page Channel A (610000h, M = 1)
        1. 8.5.6.1 Register 034h (address = 034h), Offset Corr Page Channel A
        2. 8.5.6.2 Register 068h (address = 068h), Offset Corr Page Channel A
      7. 8.5.7  Offset Corr Page Channel B (610000h, M = 1)
        1. 8.5.7.1 Register 068h (address = 068h), Offset Corr Page Channel B
      8. 8.5.8  Digital Gain Page (610005h, M = 1 for Channel A and 610105h, M = 1 for Channel B)
        1. 8.5.8.1 Register 0A6h (address = 0A6h), Digital Gain Page
      9. 8.5.9  Main Digital Page Channel A (680000h, M = 1)
        1. 8.5.9.1 Register 000h (address = 000h), Main Digital Page Channel A
        2. 8.5.9.2 Register 0A2h (address = 0A2h), Main Digital Page Channel A
      10. 8.5.10 Register 0A5h (address = 0A5h) Main Digital Page Channel A
      11. 8.5.11 Register 0A9h (address = 0A9h) Main Digital Page Channel A
      12. 8.5.12 Register 0B0h (address = 0B0h) Main Digital Page Channel A
      13. 8.5.13 Register 0B1h (address = 0B1h) Main Digital Page Channel A
      14. 8.5.14 Register 0B2h (address = 0B2h) Main Digital Page Channel A
      15. 8.5.15 Register 0B3h (address = 0B3h) Main Digital Page Channel A
      16. 8.5.16 Register 0B4h (address = 0B4h) Main Digital Page Channel A
      17. 8.5.17 Register 0B5h (address = 0B5h) Main Digital Page Channel A
      18. 8.5.18 Register 0B6h (address = 0B6h) Main Digital Page Channel A
      19. 8.5.19 Register 0B7h (address = 0B7h) Main Digital Page Channel A
      20. 8.5.20 Register 0B8h (address = 0B8h) Main Digital Page Channel A
      21. 8.5.21 Register 0B9h (address = 0B9h) Main Digital Page Channel A
      22. 8.5.22 Register 0BAh (address = 0BAh) Main Digital Page Channel A
      23. 8.5.23 Register 0BBh (address = 0BBh) Main Digital Page Channel A
      24. 8.5.24 Main Digital Page Channel B (680001h, M = 1)
        1. 8.5.24.1  Register 000h (address = 000h), Main Digital Page Channel B
        2. 8.5.24.2  Register 0A2h (address = 0A2h), Main Digital Page Channel B
        3. 8.5.24.3  Register 0B0h (address = 0B0h) Main Digital Page Channel B
        4. 8.5.24.4  Register 0B1h (address = 0B1h) Main Digital Page Channel B
        5. 8.5.24.5  Register 0B2h (address = 0B2h) Main Digital Page Channel B
        6. 8.5.24.6  Register 0B3h (address = 0B3h) Main Digital Page Channel B
        7. 8.5.24.7  Register 0B4h (address = 0B4h) Main Digital Page Channel B
        8. 8.5.24.8  Register 0B5h (address = 0B5h) Main Digital Page Channel B
        9. 8.5.24.9  Register 0B6h (address = 0B6h) Main Digital Page Channel B
        10. 8.5.24.10 Register 0B7h (address = 0B7h) Main Digital Page Channel B
        11. 8.5.24.11 Register 0B8h (address = 0B8h) Main Digital Page Channel B
        12. 8.5.24.12 Register 0B9h (address = 0B9h) Main Digital Page Channel B
        13. 8.5.24.13 Register 0BAh (address = 0BAh) Main Digital Page Channel B
        14. 8.5.24.14 Register 0BBh (address = 0BBh) Main Digital Page Channel B
      25. 8.5.25 JESD Digital Page (6900h, M = 1)
        1. 8.5.25.1  Register 001h (address = 001h), JESD Digital Page
        2. 8.5.25.2  Register 002h (address = 002h ), JESD Digital Page
        3. 8.5.25.3  Register 003h (address = 003h), JESD Digital Page
        4. 8.5.25.4  Register 004h (address = 004h), JESD Digital Page
        5. 8.5.25.5  Register 006h (address = 006h), JESD Digital Page
        6. 8.5.25.6  Register 007h (address = 007h), JESD Digital Page
        7. 8.5.25.7  Register 016h (address = 016h), JESD Digital Page
        8. 8.5.25.8  Register 017h (address = 017h), JESD Digital Page
        9. 8.5.25.9  Register 032h-035h (address = 032h-035h), JESD Digital Page
        10. 8.5.25.10 Register 036h (address = 036h), JESD Digital Page
        11. 8.5.25.11 Register 037h (address = 037h), JESD Digital Page
        12. 8.5.25.12 Register 03Ch (address = 03Ch), JESD Digital Page
        13. 8.5.25.13 Register 03Eh (address = 03Eh), JESD Digital Page
      26. 8.5.26 Decimation Filter Page
        1. 8.5.26.1  Register 000h (address = 000h), Decimation Filter Page
        2. 8.5.26.2  Register 001h (address = 001h), Decimation Filter Page
        3. 8.5.26.3  Register 002h (address = 2h), Decimation Filter Page
        4. 8.5.26.4  Register 005h (address = 005h), Decimation Filter Page
        5. 8.5.26.5  Register 006h (address = 006h), Decimation Filter Page
        6. 8.5.26.6  Register 007h (address = 007h), Decimation Filter Page
        7. 8.5.26.7  Register 008h (address = 008h), Decimation Filter Page
        8. 8.5.26.8  Register 009h (address = 009h), Decimation Filter Page
        9. 8.5.26.9  Register 00Ah (address = 00Ah), Decimation Filter Page
        10. 8.5.26.10 Register 00Bh (address = 00Bh), Decimation Filter Page
        11. 8.5.26.11 Register 00Ch (address = 00Ch), Decimation Filter Page
        12. 8.5.26.12 Register 00Dh (address = 00Dh), Decimation Filter Page
        13. 8.5.26.13 Register 00Eh (address = 00Eh), Decimation Filter Page
        14. 8.5.26.14 Register 00Fh (address = 00Fh), Decimation Filter Page
        15. 8.5.26.15 Register 010h (address = 010h), Decimation Filter Page
        16. 8.5.26.16 Register 011h (address = 011h), Decimation Filter Page
        17. 8.5.26.17 Register 014h (address = 014h), Decimation Filter Page
        18. 8.5.26.18 Register 016h (address = 016h), Decimation Filter Page
        19. 8.5.26.19 Register 01Eh (address = 01Eh), Decimation Filter Page
        20. 8.5.26.20 Register 01Fh (address = 01Fh), Decimation Filter Page
        21. 8.5.26.21 Register 033h-036h (address = 033h-036h), Decimation Filter Page
        22. 8.5.26.22 Register 037h (address = 037h), Decimation Filter Page
        23. 8.5.26.23 Register 038h (address = 038h), Decimation Filter Page
        24. 8.5.26.24 Register 039h (address = 039h), Decimation Filter Page
        25. 8.5.26.25 Register 03Ah (address = 03Ah), Decimation Filter Page
      27. 8.5.27 Power Detector Page
        1. 8.5.27.1  Register 000h (address = 000h), Power Detector Page
        2. 8.5.27.2  Register 001h-002h (address = 001h-002h), Power Detector Page
        3. 8.5.27.3  Register 003h (address = 003h), Power Detector Page
        4. 8.5.27.4  Register 007h-00Ah (address = 007h-00Ah), Power Detector Page
        5. 8.5.27.5  Register 00Bh-00Ch (address = 00Bh-00Ch), Power Detector Page
        6. 8.5.27.6  Register 00Dh (address = 00Dh), Power Detector Page
        7. 8.5.27.7  Register 00Eh (address = 00Eh), Power Detector Page
        8. 8.5.27.8  Register 00Fh, 010h-012h, and 016h-019h (address = 00Fh, 010h-012h, and 016h-019h), Power Detector Page
        9. 8.5.27.9  Register 013h-01Ah (address = 013h-01Ah), Power Detector Page
        10. 8.5.27.10 Register 01Dh-01Eh (address = 01Dh-01Eh), Power Detector Page
        11. 8.5.27.11 Register 020h (address = 020h), Power Detector Page
        12. 8.5.27.12 Register 021h (address = 021h), Power Detector Page
        13. 8.5.27.13 Register 022h-025h (address = 022h-025h), Power Detector Page
        14. 8.5.27.14 Register 027h (address = 027h), Power Detector Page
        15. 8.5.27.15 Register 02Bh (address = 02Bh), Power Detector Page
        16. 8.5.27.16 Register 032h-035h (address = 032h-035h), Power Detector Page
        17. 8.5.27.17 Register 037h (address = 037h), Power Detector Page
        18. 8.5.27.18 Register 038h (address = 038h), Power Detector Page
  9. 9 Application and Implementation
    1. 9.1 Application Information
      1. 9.1.1 Start-Up Sequence
      2. 9.1.2 Hardware Reset
      3. 9.1.3 SNR and Clock Jitter
        1. 9.1.3.1 External Clock Phase Noise Consideration
      4. 9.1.4 Power Consumption in Different Modes
      5. 9.1.5 Using DC Coupling in the ADC32RF82
        1. 9.1.5.1 Bypassing the Offset Corrector Block
          1. 9.1.5.1.1 Effect of Temperature
    2. 9.2 Typical Application
      1. 9.2.1 Design Requirements
        1. 9.2.1.1 Transformer-Coupled Circuits
      2. 9.2.2 Detailed Design Procedure
      3. 9.2.3 Application Curves
  10. 10Power Supply Recommendations
  11. 11Layout
    1. 11.1 Layout Guidelines
    2. 11.2 Layout Example
  12. 12器件和文档支持
    1. 12.1 文档支持
      1. 12.1.1 相关文档
    2. 12.2 接收文档更新通知
    3. 12.3 社区资源
    4. 12.4 商标
    5. 12.5 静电放电警告
    6. 12.6 Glossary
  13. 13机械、封装和可订购信息

封装选项

机械数据 (封装 | 引脚)
散热焊盘机械数据 (封装 | 引脚)
订购信息

Layout

Layout Guidelines

The device evaluation module (EVM) layout can be used as a reference layout to obtain the best performance. A layout diagram of the EVM top layer is provided in Figure 277. The ADC32RF45/RF80 EVM Quick Startup Guide provides a complete layout of the EVM. Some important points to remember during board layout are:

  • Analog inputs are located on opposite sides of the device pinout to ensure minimum crosstalk on the package level. To minimize crosstalk onboard, the analog inputs must exit the pinout in opposite directions, as shown in the reference layout of Figure 277 as much as possible.
  • In the device pinout, the sampling clock is located on a side perpendicular to the analog inputs in order to minimize coupling. This configuration is also maintained on the reference layout of Figure 277 as much as possible.
  • Keep digital outputs away from the analog inputs. When these digital outputs exit the pinout, the digital output traces must not be kept parallel to the analog input traces because this configuration can result in coupling from the digital outputs to the analog inputs and degrade performance. All digital output traces to the receiver [such as field-programmable gate arrays (FPGAs) or application-specific integrated circuits (ASICs)] must be matched in length to avoid skew among outputs.
  • At each power-supply pin (AVDD, DVDD, or AVDD19), keep a 0.1-µF decoupling capacitor close to the device. A separate decoupling capacitor group consisting of a parallel combination of 10-µF, 1-µF, and 0.1-µF capacitors can be kept close to the supply source.

Layout Example

ADC32RF82 evm_layout_sbas747.gif Figure 277. ADC32RF82EVM Layout