Cable Break Test

The cable break test was executed using both the auto-negotiation settings and forced mode settings for both the DP83822 and the link partner. Each disruption occured at least 500 times during a test with a certain cable length.

For a scenario to pass, the following requirements must be met:

  1. The time to detect link down when a disruption is activated must be less than 15 μsec for both auto-negotiation and forced mode.
  2. While the disruption is active, a link down status must always be recognized.
  3. When the disruption is removed, a stable link up must be acheived within 30 ms for forced mode, or 5 sec for auto-negotiation mode.
  4. After the disruption is removed, there must be no further indication of a link drop or unstable connection.

For the cable break test to pass as a whole, all scenarios must pass.