TIDT259 March   2022

 

  1.   Description
  2.   Features
  3.   Applications
  4. 1Test Prerequisites
    1. 1.1 Voltage and Current Requirements
    2. 1.2 Required Equipment
    3. 1.3 Considerations
  5. 2Testing and Results
    1. 2.1 Load Regulation
    2. 2.2 Efficiency Graphs
    3. 2.3 Efficiency Data
    4. 2.4 Input Power Limit
    5. 2.5 Thermal Images
  6. 3Waveforms
    1. 3.1 Switching
    2. 3.2 Voltage Ripple
    3. 3.3 Bode Plots
    4. 3.4 Load Transients
    5. 3.5 Start-Up Sequence

Start-Up Sequence

The following images show the start-up behavior waveforms.

GUID-20220216-SS0I-JVB5-CCFZ-LPNC1MCRGGLX-low.png Figure 3-12 Start-Up, 0-A Load, 5 V/div, 50 ms/div
GUID-20220216-SS0I-PCN9-M8J4-WGTGCVPPQT0L-low.png Figure 3-13 Start-Up, 3.8-A Load, 2 V/div, 2 ms/div